EICR for commercial property.

Offices, shops, warehouses, schools and multi-let buildings aren’t priced by the bedroom. We inspect the installation as a system, from the incoming supply through every sub-main and distribution board, and plan the testing around your trading hours so the building keeps running.

Legal basis
EaWR 1989, Reg 4
Typical interval
1–5 years by use
Testing windows
Day · evening · weekend
Report format
Per DB, per circuit
SECTION A–A · Mixed-use building
Select a callout
ROOF PLANTFLOOR 2 · OFFICEFLOOR 1 · OFFICEGROUND · RETAILBASEMENT · INTAKERISERGL ±0.001234567
Callout 1
Intake & main switchgear

Where the supply enters the building. We inspect the main switchgear, earthing arrangement and main protective bonding, and record the supply characteristics the rest of the report relies on.

Typical isolation
Whole-building shutdown, planned out of hours
Common findings
Undersized bonding, missing labels, ageing switchgear
Callout 2
Sub-mains & risers

The cables feeding each floor or tenant from the main switchboard. We check protective devices, cable condition, fire stopping where cables pass through floors, and the readings at each end.

Typical isolation
Per sub-main, coordinated with the boards it feeds
Common findings
Damaged fire stopping, overloaded or unlabelled sub-mains
Callout 3
Floor distribution boards

Every board is inspected internally and every final circuit is tested: continuity, insulation resistance, earth fault loop impedance and RCD operation.

Typical isolation
One board at a time, floor stays partly live
Common findings
Missing RCD protection, loose terminations, out-of-date charts
Callout 4
Landlord common parts

Stair and corridor lighting, door entry, lobby power and fire-alarm supplies, normally the landlord’s responsibility in a multi-let building.

Typical isolation
Short isolations, keeping escape lighting live
Common findings
Damaged fittings, borrowed neutrals, missing labels
Callout 5
Roof plant & mechanical

Motor control centres, HVAC units, lift supplies and pumps. Isolation is coordinated with your FM or maintenance contractor.

Typical isolation
With FM, after mechanical systems are safe
Common findings
Isolator damage, weathered external enclosures
Callout 6
Tenant demise

The installation within a tenant’s space, from their board to every socket, light and specialist circuit. Reported separately if needed.

Typical isolation
Before opening or after close
Common findings
Overloaded extension use, fit-out alterations without certificates
Callout 7
External, signage & EV

Car park and façade lighting, illuminated signs, external sockets and EV charge points. Outdoor equipment ages fastest.

Typical isolation
Short isolations, daytime possible
Common findings
Water ingress, failed RCDs, damaged SWA glands
Tap a numbered callout to see what's inspected in that zone
DRG
ECP-01

Who is the dutyholder?

In commercial property the electrical installation is usually split between owner and occupier. The lease decides who maintains what, and the Electricity at Work Regulations 1989 apply to whoever controls each part. Get this wrong and part of the building goes untested.

LANDLORD / OWNER

Supply & shared systems

TENANT / OCCUPIER

Within the demise

Statute
Electricity at Work Regs 1989

Regulation 4(2): systems must be maintained to prevent danger, so far as reasonably practicable.

Statute
H&S at Work etc. Act 1974

The general duty to protect employees and others affected by your undertaking.

Fire safety
Fire Safety Order 2005

Your fire risk assessment should consider the electrical installation as an ignition source.

Evidence
Insurers & leases

Many policies and leases require a current EICR. It’s the standard record of maintenance.

C

Multi-let buildings: we can test landlord and tenant installations in a single visit with separate reports for each party. That avoids two contractors, two shutdowns and gaps in between.

DRG
ECP-02

Schedule of inspection intervals.

The law doesn’t set a fixed interval for commercial premises. Most dutyholders, insurers and inspectors follow the maximum intervals recommended in IET Guidance Note 3. Your inspector may recommend a shorter interval depending on the installation’s condition and use.

Premises type
Max. interval
Relative frequency
Note
Offices
5yrs
Or on change of occupancy
Shops & retail
5yrs
Or on change of occupancy
Industrial & warehousing
3yrs
Harsher environments, more wear
Laboratories
5yrs
Specialist equipment may need more
Agricultural & horticultural
3yrs
Damp, dust and livestock
Restaurants & hotels
5yrs
Commercial kitchens checked closely
Public houses
5yrs
Cellar & external areas included
Educational establishments
5yrs
Often tested in holiday periods
Hospitals & medical
5yrs
Medical locations may need more
Places of public entertainment, theatres, cinemas, leisure complexes
3yrs
High occupancy, high usage
Churches & community halls
5yrs
Older installations are common
Swimming pools & fountains
1yr
Special location under BS 7671 Part 7
Petrol filling stations
1yr
Hazardous areas, licensing conditions
Caravan parks & marinas
1yr
Outdoor supply pillars
Construction site installations
3mths
Temporary supplies

Source: recommended maximum intervals, IET Guidance Note 3 (Inspection & Testing). Emergency lighting and fire alarm systems are tested separately under their own standards.

DRG
ECP-03

Phased around the business.

Testing means isolating circuits, so we agree an isolation plan before anyone opens a board. Here’s a typical weekend programme for a three-storey mixed-use building: each board is tested in its own window, with critical circuits kept live or tested last.

BOARD
FRI 18:00
FRI 22:00
SAT 08:00
SAT 13:00
SAT 18:00
SUN 10:00
MSB · Intake
Shutdown
DB-G Retail
Test · 22 ccts
DB-1 Office
Test · 18 ccts
DB-2 Office
Test · 18 ccts
DB-LL Common
Sampled
MCC Plant
Isolate w/ FM
Report
Re-energise
Full test
Sampled / admin
Coordinated shutdown
Out-of-hours

Evening, night and weekend windows for retail, hospitality and offices that can’t lose power while trading.

Board-by-board

Each DB is isolated separately, so most of the building stays live while one area is tested.

Agreed sampling

On large, well-documented installations a sample of circuits can be tested in detail, as an agreed limitation recorded on the report. If defects turn up, the sample is extended.

Critical loads

Servers, refrigeration, medical and security systems are identified up front and handled with your facilities team.

DRG
ECP-04

Every premises type, its own constraints.

The tests are the same, but the access, timing and risks are different for each kind of building. We plan around each one.

P-01

Offices

Floor-by-floor testing with IT and server circuits planned around your working hours.

5 YR · Out-of-hours friendly
P-02

Retail units

Shopfront, signage, display lighting and tills, tested before opening or after close.

5 YR · Early-morning windows
P-03

Industrial & warehouse

Three-phase supplies, machinery isolators, high-bay lighting and racking areas.

3 YR · Shift-pattern planning
P-04

Hospitality

Commercial kitchens, cellars, bedrooms and external areas, with guest disruption kept to a minimum.

5 YR · Overnight possible
P-05

Education

Classrooms, labs, kitchens and sports halls, tested in holiday periods.

5 YR · Holiday scheduling
P-06

Healthcare & care

Clinics, surgeries and care settings, where critical and medical circuits are planned with care.

5 YR · Critical loads first
P-07

Blocks & mixed-use

Landlord supplies, common parts and plant, with separate reports for each tenant on request.

5 YR · Landlord + tenant split
P-08

Leisure & venues

Gyms, cinemas, halls and venues, where high occupancy means shorter intervals.

1–3 YR · Special locations
DRG
ECP-05

A report your FM team can act on.

For a commercial building, a one-line “satisfactory” isn’t enough. You get results board by board and circuit by circuit, with observations your maintenance team, insurer and landlord can all follow.

Ref
Document
Status
D-01
EICR summary & declaration
Overall condition, extent and agreed limitations
Included
D-02
Schedule of inspections
Every item checked, recorded against the board
Included
D-03
Schedule of test results
Per circuit: continuity, insulation, Zs, RCD
Included
D-04
Coded observations
C1 · C2 · FI · C3, with location & description
Included
D-05
Remedial quotation
Itemised, priced per observation
Included
D-06
Updated circuit charts
Fixed inside each distribution board
Optional
D-07
Thermographic survey
Infrared scan of boards under load
Optional
SCHEDULE OF TEST RESULTS · DB-1
SAMPLE
Cct
Description
Device
R1+R2 Ω
IR MΩ
Zs Ω
RCD ms
Code
1
Lighting N
B6
0.84
>200
1.12
18
✓
2
Lighting S
B6
0.91
>200
1.20
21
✓
3
Sockets N ring
B32
0.38
>200
0.66
24
✓
4
Sockets S ring
B32
0.41
4.6
0.70
23
C2
5
Kitchenette
B20
0.29
>200
0.58
19
✓
6
Comms room
B16
0.33
>200
0.61
N/A
C2
Illustrative extract. Cct 4: low insulation resistance, investigate. Cct 6: no RCD protection for socket outlets.
C1

Danger present

Immediate risk. Made safe on the day.

→ ISOLATE NOW
C2

Potentially dangerous

Urgent remedial work required.

→ URGENT
FI

Investigate

Possible defect needing investigation.

→ WITHOUT DELAY
C3

Improvement

Recommended, not unsafe.

→ PLAN IN
DRG
ECP-06

What shapes the quotation.

Commercial EICRs are priced on the installation, not the floor area alone. A small shop unit with up to 10 circuits starts from £149.99. A large multi-board building is quoted from a schedule of boards and circuits. These are the factors that move the price most.

Number of circuits
The biggest single factor: each one is tested
Distribution boards
Each board adds inspection and isolation time
Out-of-hours working
Evening and weekend windows cost more
Records & labelling
Missing charts mean circuits must be traced first
Three-phase & plant
Motor circuits and switchgear take more time
Agreed sampling
Can reduce on-site time on large estates
STEP 01

Desktop review

Send us any previous EICR, floor plans and board locations. We work out the scope and isolation needs.

STEP 02

Fixed quotation & method

A written price, programme and isolation plan, agreed with you or your FM before booking.

STEP 03

Inspection & testing

Board by board, in agreed windows, with C1 dangers made safe on the day.

STEP 04

Report & remedials

Full digital report with an itemised remedial quote. You decide what happens next.

DRG
ECP-07

Questions from dutyholders.

Common questions from facilities managers, commercial landlords and business owners.

The law doesn’t name the EICR specifically. The Electricity at Work Regulations 1989 require electrical systems to be maintained so they don’t cause danger, and periodic inspection and testing is the accepted way to show that. In practice, insurers, landlords, lenders and fire risk assessments usually expect a current EICR.

IET Guidance Note 3 recommends maximum intervals: five years for offices, shops, hotels and schools; three years for industrial premises and places of public entertainment; and one year for special locations such as swimming pools and petrol stations. The inspector may recommend a shorter interval depending on condition.

Circuits have to be isolated to test them safely, but not all at once. We plan board-by-board isolations, often out of hours, and identify critical loads such as servers, refrigeration and security systems in advance so they’re protected or tested in a controlled window.

It depends on the lease. Typically the landlord is responsible for the supply, risers, common parts and shared plant, and the tenant for the installation inside their demise. We can test both in one visit and issue separate reports for each party.

On larger installations with good records, the inspector can agree to test a representative sample of circuits in detail. The percentage and reasoning are recorded as an agreed limitation on the report. If the sample reveals defects, it’s extended. Sampling isn’t suitable where records are poor or the installation is in poor condition.

No. Emergency lighting (BS 5266) and fire detection and alarm systems (BS 5839) have their own inspection, testing and certification regimes. We can arrange them alongside the EICR so there’s only one visit.

A small shop or office unit can take half a day. Larger buildings take several days, depending on the number of boards and circuits, access, and whether testing is phased. We give you a programme with the quotation.

Any C1 danger is made safe before we leave. C2 and FI items need prompt action. We provide an itemised remedial quotation, and once the work is done you receive certification for it (a Minor Works or Electrical Installation Certificate) for your records.

RFQ
ECP-08

Send the building, not just the postcode.

The more we know about the installation, the more accurate and firm the quotation. Rough numbers are fine. If you have a previous EICR, mention it and we’ll ask for a copy.

REQUEST FOR QUOTATION
RFQ-0000
Requirements
Response within one working day